Campus Project
590 EAST 83RD STREET



83,750 square foot facility to include
Science labs, auditorium, music program, regulation-size
gymnasium, lower school classrooms, lower school library,
maker space, and common room.

60,450 square feet will be dedicated to spaces used by multiple Divisions
23,300 square feet will house the Lower School

Total construction costs
$85 million

Funding sources
Long-term loan, gifts from prior campaign that were invested
with the endowment, and new philanthropic support.

Total philanthropic gifts needed to build 590
$51.5 million

Additional gifts needed to build 590 (as of 10/2017)
$12.6 million

610 EAST 83RD STREET



Elevator upgrades began summer 2017.

Classrooms formerly dedicated to Lower School become available to Middle School and Upper School teachers and students as soon as 590 is complete.

Upgrades are planned for internal systems—plumbing, electrical, HVAC.

Master campus plan includes exciting future opportunities for 610 Schoolhouse

+ Library for Middle School and Upper School on 10th floor with beautiful river views

+ Cafeteria on 1st floor with natural light

+ Lobby expansion to reincorporate original features, such as fireplace

+ Assembly Hall upgrades to support theater program
The Brearley School
610 East 83rd Street
New York, NY 10028
212.570.8625